Engineering decision cases

The number that changes the project.

These are simulated educational cases built around the decisions cement plants actually have to defend: process performance first, investment value second.

← All decision cases

The cheap RDF contract that reduced kiln production

The supplier price per tonne is lower than the current fuel cost. The contract appears profitable until the plant checks moisture, NCV, ash, chlorine and the extra fuel mass required.

Your decision: Should the contract be approved from price per tonne alone?

simulated_educational

Choose the strongest engineering response