Specialized Tools · Cement Mill · No. 11
How wide is the particle size spread of your cement?
Two cements pass with the same 45 µm residue, yet one needs more water and loses early strength at the customer. The difference is the shape of the particle size spread, set mostly at the separator, and one fineness number hides it.
What it savesExplains why two cements with the same residue behave differently in concrete.
- Excel 2013 or later, Windows and Mac
- No macros, no internet
- Updates for life
- Updates for life
- Your name on every sheet

How this file helps
Find out if it is happening to you, how much it costs, and what to correct.
What it gives you
The shape of the cement in two numbers.
See it working
Worked on a demonstration plant.



Worked out for you
5 results from the figures you already measure.
What is inside the file
What you need
- 1A sieve analysis of the cement, 3 to 7 sieves, cumulative residue
- 2Optional: a second sample to compare
Questions
Before you buy
Can I see it before I buy?
Yes. The sample report shows the whole first sheet of the file, worked on a demonstration plant: every result, the charts and what to do first.
Does it need the internet or macros?
No. It works on Excel 2013 or later, on Windows or Mac, with no macros and no connection. Nothing to install.
Can I use it for several products?
Yes. Save one copy per product and per test. The file is yours to use for as long as you like.
What is the What-if column?
Type a new figure beside today's and see every result change, before anything is changed in the plant.
Who may use my copy?
One engineer or one plant. Your name is written on every sheet.
How do I pay?
Press Buy. We reply on WhatsApp and by email with the bank details. When the payment arrives, your copy is ready to download from this page.
How wide is the particle size spread of your cement?
Have the answer with your next figures.
More in the Cement Mill package
The other files of this package

Is your separator sending finished cement back to the mill?
The mill runs hard, the power climbs, and the tons will not come. Often the reason sits on top of the mill: a separator sending finished cement back to be ground again.
What it savesStops the mill grinding cement that was already fine.
- Know in minutes if the separator is the reason the mill is slow or uses too much power
- Know what to fix first: guide vanes, rotor seal, air or feed spread, with the reason

Where along your mill does the grinding stop?
The mill was relined and topped up, and still the tons will not come. Somewhere along the shell, a stretch of mill has stopped grinding.
What it savesFinds the metres of mill that turn, wear and draw power without grinding.
- Dead and slow stretches found sieve by sieve, with where to look
- Where the coarse job really finishes, against the diaphragm

Is your mill drive pulling what the ball charge needs?
The drive pulls more power than last year for the same cement. Is the charge heavier than the records say, are the liners worn, or is the mill empty of work?
What it savesFinds the kW the drive takes for no grinding.
- The power the charge should take, chamber by chamber, at the motor
- The panel reading checked against it, with the reason when they differ

How many tons of balls should go in at the next stop?
After the top-up the mill draws more power and grinds no more. Too much steel cushions the charge; too little wears the liners. Both cost output.
What it savesEnds the guesswork on top-ups: the exact tons, and the tape reading that proves they went in.
- The filling of each chamber from one tape reading
- The tons to add or take out to reach the target

Is your ball charge still the one the mill needs?
The Blaine drifts down month after month and the same power buys less fineness. The charge sheet says nothing is wrong, but the steel inside has changed.
What it savesKeeps the steel grinding instead of just adding weight.
- The average ball and the grinding surface of each chamber, graded
- The filling from the recorded tons, and the tape reading it implies

Where are your top-ups taking the ball charge?
The first chamber slowly fills with small balls nobody ordered. Each top-up adds the right tons and, quietly, the wrong grading.
What it savesStops paying for steel that ends up as small balls doing no work.
- Each chamber worked through the coming top-ups, size by size
- The sizes drifting off target, and the new sizes appearing